*** Welcome to piglix ***

Rochester Subway

Rochester Industrial and Rapid Transit Railway (Rochester Subway)
Reporting mark RSB
Locale City of Rochester and Brighton, New York
Dates of operation 1927–1956
Predecessor Erie Canal
Successor Interstate 490
Interstate 590
Track gauge 4 ft 8 12 in (1,435 mm)
Electrification 600v DC
Length About 7 miles
Headquarters Rochester, New York

The Rochester Industrial and Rapid Transit Railway (reporting mark RSB), more commonly known as the Rochester Subway was a light rail rapid transit line in the city of Rochester, New York from 1927 to 1956. The subway was constructed in the bed of the old Erie Canal, which allowed the route to be grade-separated for its entire length. Two miles (3.2 km) of the route through downtown were constructed in a cut-and-cover tunnel that became Broad Street, and the only underground portion of the subway. The Rochester Subway was designed to funnel interurban traffic off of city streets, and to facilitate freight interchange between the railroads. The line was operated on a contract basis by New York State Railways until Rochester Transit Corporation (RTC) took over in 1938. The last day of passenger service was June 30, 1956. Portions of the right-of-way were used for expressway construction, while the rest was abandoned and filled in over the years. The largest remaining section is a stretch of underground tunnel under Broad Street from Exchange Street to the intersection of Court Street and South Avenue.

In 1918, the Erie Canal was re-routed to bypass downtown Rochester, and in 1919 the abandoned portion of the canal was bought to serve as the core of the subway. The subway was built below, and the subway's roof was turned into Broad Street. Only 2 miles (3.2 km) were in the tunnel, the rest of the route in open cut. The term "subway" did not refer to the tunnel, but to the route being grade-separated and operated as rapid transit. Connecting interurban lines were routed into the subway and off city streets, easing developing traffic congestion. The segment over the Genesee River utilized the former Erie Canal: Second Genesee Aqueduct.

Construction was completed and operations began in 1927, under contract with New York State Railways. Ten former Utica and Mohawk Valley Railway 2000-series cars were transferred from the Utica Lines to provide dedicated service in the Rochester Subway. New York State Railways entered receivership in 1929, but continued to operate the subway on a contract basis with the city of Rochester. Interurban railways began using the new subway almost immediately. Starting in 1927, the Rochester and Eastern Rapid Railway connected at Rowlands and terminated at City Hall station. The Rochester and Syracuse Railroad began using the subway in 1928, using a new connection established just east of Winton Road station. The Rochester, Lockport and Buffalo Railroad entered from the west side starting in 1928 using a ramp constructed at Lyell Avenue.


...
Wikipedia

...