Rail transport in Australia is a crucial aspect of the Australian transport network. Rail in Australia is to a large extent state-based. As at 2014, the Australian rail network consists of a total of 32,784 kilometres (20,371 mi) of track on three major track gauges.
Except for a small number of private railways, most of the Australian railway network infrastructure is government-owned, either at the federal or state level. Most railway operators were once state government agencies, but with privatisation in the 1990s, private companies now operate the majority of trains in Australia.
The Australian federal government is involved in the formation of national policies, and provides funding for national projects. Rail transport in Australia has often been neglected in favour of the Australian road transport network.
Very little thought was given in the early years of the development of the colony-based rail networks of Australia-wide interests. The most obvious issue to arise was determining a track gauge. Despite advice from London to adopt a uniform gauge, should the lines of the various colonies ever meet, gauges were adopted in different colonies, and indeed within colonies, without reference to those of other colonies. This has caused problems ever since.
Attempts to fix the gauge problem are by no means complete. For example, the Mount Gambier line is isolated by gauge and of no operational value.
With the electrification of suburban networks, which began in 1919, a consistent electric rail traction standard was not adopted. Electrification began in Melbourne in 1919 using 1500 V DC. Sydney's lines were electrified from 1926 using 1500 V DC, Brisbane's from 1979 using 25 kV AC, and Perth's from 1992 using 25 kV AC. There has also been extensive non-urban electrification in Queensland using 25 kV AC, mainly during the 1980s for the coal routes. In 2008 plans were revealed to electrify Adelaide at 25 kV AC. 25 kV AC voltage has now become the international standard.