*** Welcome to piglix ***

Porrettana railway

Bologna–Pistoia railway
Overview
Type Heavy rail
Status in use
Locale Emilia-Romagna and Tuscany, Italy
Termini Bologna
Pistoia
Operation
Opened 1864 (1864)
Owner RFI
Operator(s) Trenitalia
Technical
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 3 kV DC
overhead line
Route map
from Ancona, from Florence and from Portomaggiore
131.834 Bologna Centrale 45 m
to Padua
127.676 P.M. Santa Viola
to Milan and to Verona
126.905 Bologna Borgo Panigale 46 m
125.325 Casteldebolesince 2002
123.106 Casalecchio Garibaldisince 2002
to Vignola
122.077 Casalecchio di Reno 70 m
118.547 Borgonuovo
116.221 Pontecchio Marconi 91 m
112.813 Sasso Marconi 107 m
107.911 Lama di Renosince 1948 114 m
105.289 Marzabotto 129 m
103.107 Pian di Venolasince 2004
99.071 Pioppe di Salvaro 163 m
93.432 Vergato 194 m
89.078 Carbonasince 1949 222 m
Riola (1384 m)
85.032 Riola 252 m
Pian di Casale (2622 m)
75.855 Silla 330 m
73.367 Porretta Terme 352 m
69.890 Ponte della Venturinasince 1909 396 m
65.714 Molino del Pallone 495 m
63.668 Biagioni-Lagaccisince 1950 506 m
58.596 Pracchia 616 m
Appennino (2727 m)
55.441 San Mommè 544 m
53.440 Castagno 493 m
Signorino-Seccheto (1431 m)
51.077 Corbezzi 418 m
Piteccio-Vignacci-Fabbiana (1750 m)
45.096 Piteccio 291 m
38.801 Valdibrana 200 m
35.330 Pistoia Ovest
from Viareggio
33.573 Pistoia 63 m
to Florence

...
Wikipedia

...