Pink Line पिंक लाइन |
|
---|---|
Overview | |
Type | Rapid transit |
System | Delhi Metro |
Status | Under Construction |
Locale | Delhi, Ghaziabad |
Termini |
Majlis Park Shiv Vihar |
Stations | 38 , Elevated: 26, Underground: 12 |
Operation | |
Opened | first phase (Majlis Park - Lajpat Nagar) opening September 2017 |
Owner | Delhi Metro |
Operator(s) | Delhi Metro Rail Corporation |
Character | underground and elevated |
Rolling stock | Hyundai-ROTEM Standard gauge |
Technical | |
Line length | 58.59 kilometers (36.41 mi), Elevated 39.48 kilometers (24.53 mi); Underground 19.11 kilometers (11.87 mi) |
Track length | 58.59 kilometers (36.41 mi) |
Track gauge | standard gauge |
Electrification | 25 kV, 50 Hz AC through overhead catenary |
The Pink Line (Hindi: पिंक लाइन) is an under construction line of the Delhi Metro, a rapid transit system in Delhi, India. The line is a part of Delhi Metro Phase III network. It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi. On completion, the Pink Line with a length of 58.59 kilometres (36.41 mi) will be the longest line in Delhi Metro, breaking the record set by the operational Blue Line. It will be mostly elevated and will be covering Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy Ring Road in Delhi, that witnesses massive traffic jams everyday.
The Pink line has planned interchanges with all operational lines of the network such as the Yellow, Red, Green, Blue, Orange Line and Violet lines, as well as with the Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBT's at Anand Vihar and Sarai Kale Khan. The Pink Line will have highest point of Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.