Padma Bridge

The Padma Multipurpose Bridge
Coordinates 23°25′21″N 90°18′35″E / 23.42250°N 90.30972°E / 23.42250; 90.30972Coordinates: 23°25′21″N 90°18′35″E / 23.42250°N 90.30972°E / 23.42250; 90.30972
Carries Motor vehicles, Railway
Crosses Padma River
Locale Louhajong, Munshiganj to Shariatpur and Madaripur
Maintained by Bangladesh Bridge Authority
Characteristics
Design Truss bridge
Material Steel
Total length 6,150 m (20,180 ft)
Width 18.10 m (59.4 ft)
History
Designer AECOM
Constructed by China Major Bridge Engineering Company Limited
Construction start 7 December 2014
Construction end Expected in December 2018
Construction cost BDT: 12,133.39 crore (est.)
Opened December 2018

The Padma Bridge is a multipurpose road-rail bridge across the Padma River under construction in Bangladesh. It will connect Louhajong, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. Padma Bridge is the most challenging construction project in the history of Bangladesh. The two-level steel truss bridge will carry a four-lane highway on the upper level and a single track railway on a lower level. With 150 m span, 6150 m total length and 18.10 m width it is going to be the largest bridge in the Padma-Brahmaputra-Meghna river basins of country in terms of both span and the total length.

The project covers three districts —Munshiganj (Mawa Point/North bank), Shariatpur and Madaripur (Janjira/South bank). The total area of land to be acquired and required for its components is 918 hectares. The requisition of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 ha has been identified for acquisition, bringing the total to 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures and due to a change in railway alignment.

Project cost is estimated to be US$3.00 billion. The Padma Multipurpose Bridge (PMB) project was designed to be funded by donors such as the World Bank, Japan International Cooperation Agency (JICA), Asian Development Bank (ADB) and Islamic Development Bank (IDB). After allegation of corruption by some people associated with project preparation the World Bank withdrew its commitment and other donors followed. However, the corruption allegations were subsequently found to be false and without merit and the Canadian Court subsequently dismissed the case. The project is now being funded from own resources of the Government of Bangladesh.


...