*** Welcome to piglix ***

PRT Logar

Provincial Reconstruction Team Logar
Insignia of PRT Lowgar
Insignia of PRT Logar
Active 19 March 2008 - Present
Country Czech Republic
Branch Land Forces
Type Light Motorised Task Force
Role Reconstruction/Area Security
Size as of February 2010: 298 total (286 soldiers and 12 civilians)

PRT Logar (Czech: Provinční rekonstrukční tým Logar) is Provincial Reconstruction Team and is part of the International Security Assistance Force - an international military force in Afghanistan. PRT Logar is subordinated to ISAF Regional Command East which is responsible for the eastern provinces of Afghanistan. Regional Command East with its HQ in Bagram is a U.S.-run Operational Command containing units from several other NATO and non-NATO countries. The task of PRT Logar is to help Afghan government rebuild and further develop Logar province.

The PRT combines civilian experts from the Czech Ministry of Foreign Affairs and the Czech Army military, whose role is to maintain a secure environment for reconstruction projects. The Czech PRT has proportionally one of the highest numbers of civilian experts in PRT. The members of the civilian team include construction enginees, development specialists and experts in areas such as agriculture, security, media or veterinary medicine. These specialists cooperate with the provincial government, councils of elders (suras) and other representatives of local communities to extend their capacities and, through a broad range of joint projects, to have a positive impact on the province both in mid and long-term.

PRT Logar was established on March 19, 2008 as a 26th Provincial Reconstruction Team deployed to Afghanistan. The PRT is located at U.S. Forward Operating Base Shank near capital of the Logar province, Pul-i-Alam. Current area of responsibility is 3,800 km².

PRT Logar, as of July 2008, was composed of 192 troops and 7 civilians. Troops were mostly members of 102nd Reconnaissance Battalion (1st Contingent) with attachments from other units. In August 2008, 102nd Reconnaissance Battalion was replaced by troops of the 7th Mechanized Brigade (2nd Contingent). As of August 2008, PRT Logar was composed of 200 troops and 8 civilians. In March 2009 the troops of the 7th Mechanized Brigade were replaced by troops of the 4th Rapid Deployment Brigade (42nd Mechanized Battalion - 3rd Contingent, 41st Mechanized Battalion - 4th Contingent). As of March 2009, the number of troops was increased to 275 and the number of civilians to 10. As of February 2010, the 7th Mechanized Brigade (72nd Mechanized Battalion - 5th Contingent / 5th Unit) took over again and the number of personnel was further increased to 286 troops and 12 civilians. In August 2010, the 7th Mechanized Brigade (71st Mechanized Battalion - 6th Unit) was deployed and the number of personnel was set to 261 troops and 11 civilians. In February 2011, the 4th Rapid Deployment Brigade (43rd Airborne Battalion - 7th Unit) was deployed and the number of personnel was set to 293 troops and 11 civilians. In August 2011 they were relieved by 102nd Reconnaissance Battalion (8th Unit) and the number of personnel was set to 292 troops and 12 civilians.


...
Wikipedia

...