*** Welcome to piglix ***

NZR Wh class

NZR WH class
Type and origin
Power type Steam
Builder Manning Wardle, Leeds, England
Serial number 920 to 924
Build date 1884
Total produced 5
Specifications
Configuration:
 • Whyte 2-6-2T
Gauge 3 ft 6 in (1,067 mm)
Wheel diameter 37 in (940 mm)
Adhesive weight 23.9 long tons (24.3 t; 26.8 short tons)
Loco weight 32.9 long tons (33.4 t; 36.8 short tons)
Fuel type Coal
Firebox:
 • Firegrate area
12 sq ft (1.1 m2)
Boiler pressure 140 psi (965 kPa)
Heating surface 687 sq ft (63.8 m2)
Cylinders 2
Cylinder size 12 in × 18 in (305 mm × 457 mm)
Performance figures
Tractive effort 7,850 lbf (34.9 kN)
Career
Operators Wellington and Manawatu Railway, New Zealand Government Railways
Locale Wellington - Manawatu Line
Disposition Withdrawn
Type and origin
Power type Steam
Builder Manning Wardle, Leeds, England
Serial number 920 to 924
Build date 1884
Total produced 5
Specifications
Configuration:
 • Whyte 2-6-2T
Gauge 3 ft 6 in (1,067 mm)
Wheel diameter 37 in (940 mm)
Adhesive weight 23.9 long tons (24.3 t; 26.8 short tons)
Loco weight 32.9 long tons (33.4 t; 36.8 short tons)
Fuel type Coal
Firebox:
 • Firegrate area
12 sq ft (1.1 m2)
Boiler pressure 140 psi (965 kPa)
Heating surface 687 sq ft (63.8 m2)
Cylinders 2
Cylinder size 12 in × 18 in (305 mm × 457 mm)
Performance figures
Tractive effort 7,850 lbf (34.9 kN)
Career
Operators Wellington and Manawatu Railway, New Zealand Government Railways
Locale Wellington - Manawatu Line
Disposition Withdrawn

The NZR WH class was a class of three steam locomotives built by Manning Wardle in 1884 for service on New Zealand's private Wellington and Manawatu Railway Company (WMR). They did not acquire their WH classification until 1908 when WMR was nationalised and incorporated into the New Zealand Government Railways (NZR). A total of five locomotives were purchased by the WMR but two had been sold by the time NZR took over the company.

The first locomotives purchased by the WMR were five 2-6-2T light tank locomotives, to be used for construction work and then for local traffic. The WMR engineer in charge of construction Harry Higginson sent his requirements to the WMR’s agent in London Sir Julius Vogel in 1883. Mr Bromley drew up detailed drawings and specifications, and a tender was awarded in January 1884 to Manning Wardle of Leeds, England. The first locomotive was tested at Leeds by Mr Bromley, who was killed in a railway accident at Bulhouse while returning to London.

No. 1 & 2 arrived at Wellington on the SS Aorangi on 15 September, and Nos. 4 & 5 on the SS Ionic arrived on 28 January 1885. No. 1 was tested at the Petone NZR workshops, and found to have tight bearings, with Higginson rebutting rumours printed in the Evening Post that it was of unsatisfactory design and manufacture. Their centre drivers were flangeless; and the smokeboxes were too short (possibly because of the coal used) so were extended within a couple of years. The extension improved their performance, if not their appearance. The first engine was eagerly awaited in September 1884, as the formation to Johnsonville was ready for tracklaying and ballasting, but the WMR had unsuccessfully tried to hire a locomotive from the Government in August 1884. The last two were shipped to Wanganui after erection at Wellington to provide much-needed motive power at the isolated Longburn end.

These engines were expected to haul 70 tons up the 1 in 40 grade to Johnsonville; and two in tandem could be used to Johnsonville, with only one proceeding to Paekakariki. For the easier run to Longburn a faster tender locomotive was required, and three engines similar to the NZR V class were ordered in 1883. The tank engines were averaging about 24,000 miles each in 1887-88 but about 17,000 miles each in 1889. By 1892, half of the running of Nos. 2, 3 & 5 was for track maintenance work (some 25,000 miles) and half for shunting and Wellington-Paekakariki banking. No. 5 required repairs in 1887-88 and 1892.


...
Wikipedia

...