The Murrin Murrin Joint Venture is a major nickel-cobalt mining operation being conducted in the North Eastern Goldfields, approximately 45 km east of Leonora, Western Australia. The Project was a joint venture between Murrin Murrin Holdings Pty Ltd, a wholly owned subsidiary of Minara Resources Ltd (whose share is 60%) and Glenmurrin Pty Ltd, a wholly owned subsidiary of Glencore International AG, which had a 40% share but also owned 70% of Minara. As of November 2011, Minara Resources was fully acquired and is now wholly owned by Glencore International. The mine opened in 1999.
Murrin Murrin mines a laterite nickel ore formed by deep weathering of a peridotite ultramafic rock.
Significant problems and delays were encountered in the design, construction and commissioning of the ore process plant at Murrin Murrin.
The designers, Fluor Daniel eventually had to pay the joint venture partners A$155 million in an out of court settlement. It was their second successful claim against Fluor, Murrin Murrin owners having been awarded $147 million from the first phase of their claim against Fluor, a sum which ultimately was reduced to $39.8 million. The Murrin Murrin project's original cost estimate of $1 billion had blown out $1.6 billion.
Production of the mine: