Mughalsarai–Kanpur section | |
---|---|
Overview | |
Status | Operational |
Locale | Gangetic Plain in Uttar Pradesh |
Termini |
Mughalsarai Junction Kanpur Central |
Operation | |
Opened | 1859 (partial, locally) 1866 (through main line) |
Owner | Indian Railway |
Operator(s) |
North Central Railway for main line North Eastern Railway and Northern Railway for certain branch lines |
Depot(s) | Mughalsarai and Kanpur |
Rolling stock | WDM-2, WDM-3A and WDS-5 diesel locos; WAM-4, WAP-4 and WAG-7 electric locos |
Technical | |
Track length | Main line: 346 km (215 mi) Branch lines: Varanasi-Allahabad City 130 km (81 mi) Varanasi-Phaphamau 122 km (76 mi) Allahabad-Kanpur via Unnao 249 km (155 mi) |
Track gauge | 1,676 mm (5 ft 6 in) broad gauge |
Electrification | 25kV 50Hz AC OHLE in 1968 |
Operating speed | up to 160 km/h |
Mughalsarai–Kanpur section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|