*** Welcome to piglix ***

Govindpuri railway station

Govindpuri
Indian Railway station
Location Govind Nagar, Kanpur, India
Coordinates 26°27′14″N 80°18′49″E / 26.4538°N 80.3136°E / 26.4538; 80.3136Coordinates: 26°27′14″N 80°18′49″E / 26.4538°N 80.3136°E / 26.4538; 80.3136
Owned by Indian Railways
Line(s)

New DelhiKanpurHowrah
KanpurJhansi

KanpurBanda
Platforms 2 (present)
Tracks 12
Construction
Structure type Railway station
Parking Available
Bicycle facilities Available
Other information
Station code GOY
Division(s) Allahabad
Fare zone North Central Railways
History
Electrified Year?
Previous names Indian Branch Railway Company
Northern Railway
Services
ATM

New DelhiKanpurHowrah
KanpurJhansi

Govindpuri (Hindi:गोविंदपुरी) or Kanpur South is a railway station in Kanpur which caters 50,000 passengers to their destinations. It is second busiest railway station in Kanpur, after Kanpur Central.

Strictly speaking by definition, it is the JUNCTION where Jhansi/Banda line is separated from Delhi-Howrah Line; however, it is not granted JUNCTION status yet due to which it has two station codes, GOV and GOY.

It is located near Govind Nagar locality in Kanpur South. A rail overbridge is also there (bearing the same name), which remains congested throughout the day.

Due to proximity to Juhi yard, the station was called Juhi till the 1970s. Then as urban agglomeration in South Kanpur increased, the station was renamed Govindpuri due to proximity to Govind Nagar, a locality named and inaugurated by Govind Vallabh Pant.

Trains whose timings are not Known

Important trains with no stops

However, in next two years, things will change it will become the first halt station in India which will directly turn into Terminal station. Kanpur South The new terminal will help decongest Kanpur Central which has got saturated as it caters over 350 trains. It is modelled same as Anand Vihar Terminal in Delhi.

The station is ongoing construction of new waiting room, new ticketing room, new platforms and overbridge. The Reservation Room has been constructed and now in use and older one will be dismantled. The new Platform No. 1 is also under construction which be longer and slightly before than earlier one leaving an extra loop line between Platform no. 1 and Platform no. 2. The older Platform No. 1 will be dismantled.

The width of Platform No. 2 and Platform No. 3 is also been increased.


...
Wikipedia

...