Moose Jaw Civic Centre

Moose Jaw Civic Centre
The Crushed Can
Moose Jaw Civic Centre.JPG
Location Main Street North and Civic Centre Drive, Moose Jaw, Saskatchewan, Canada
Coordinates 50°24′17.17″N 105°32′1.64″W / 50.4047694°N 105.5337889°W / 50.4047694; -105.5337889Coordinates: 50°24′17.17″N 105°32′1.64″W / 50.4047694°N 105.5337889°W / 50.4047694; -105.5337889
Owner City of Moose Jaw
Capacity 3,146
Construction
Opened September 19, 1959 (1959-09-19)
Closed September 2011
Demolished August–November 2012
Construction cost $525,000
Architect Joseph Pettick
Structural engineer J.L. Miller

The Moose Jaw Civic Centre was a 3,146-seat multi-purpose arena located in Moose Jaw, Saskatchewan, Canada, and was home to the Moose Jaw Warriors junior ice hockey team. The building shared the same parking lot with the Town 'N' Country Mall, Moose Jaw's only indoor shopping centre.

Designed by Saskatchewan architect Joseph Pettick and Vancouver structural engineer J.L. Miller, the Civic Centre won the Massey Medal for architecture, a precursor to Canada's Governor General's Medals in Architecture. The innovative cable structure roof that gave the building its unique shape, was an ingenious and cost effective solution that allowed such a large building to be constructed on a modest budget, while maintaining an unobstucted view of the arena surface from all seats. At the time it was built it was the largest cable structure in Canada. It earned the nickname of "The Crushed Can" because of its unusual shape.

The impetus for the building was a fire that destroyed the old arena rink on Ross Street in the fall of 1955. City Council then appointed a group of citizens to oversee plans for a new building. The building was officially opened as The Moose Jaw Community Centre on September 19, 1959, with a gala event hosted by Saskatchewan Premier Tommy Douglas, and featuring a performance by Louis Armstrong & His All-Stars.

After initial tenders in the range of one million dollars, the length of the building was shortened, and the final cost was a mere $525,000.00. The building opened on budget and debt free. Current replacement cost of the building would be in the tens of millions of dollars.

Mosaic Place, completed in 2011, served as a replacement for the Moose Jaw Civic Centre. The City mothballed the Civic Centre in September 2011, and demolition was a possibility. Six private developers approached the city with plans to redevelop the building, and in April 2012 an agreement of sale was reached with Civic Centre Plaza Inc. However, the plans unveiled on May 29, 2012, show the original building being demolished and replaced with several new buildings that mimic the Civic Centre's roofline. Demolition work commenced in August 2012 and was largely completed by November.


...