*** Welcome to piglix ***

Mokama-Barauni section

Mokama–Barauni section
Overview
Type Electrified
System Broad Gauge
Status Operational
Locale Bihar
Termini Mokama Junction
Barauni
Stations 9
Operation
Owner Indian Railway
Operator(s) East Central Railway
Technical
Line length 21 km (13 mi)
Track gauge 1,676 mm (5 ft 6 in) broad gauge
Track gauge Broad gauge 1,676 mm (5 ft 6 in)


Source: Indian Railways Time Table, Eastern Zone

The Mokama–Barauni section connects Mokama Junction and Barauni in the Indian state of Bihar .

The Howrah–Delhi Main Line on the southern side of the Ganges was opened to through traffic in 1866 and the railway lines on the northern side of the Ganges also came up in the subsequent years of the nineteenth century. The lines could only be connected with the construction of 2-kilometre (1.2 mi) long Rajendra Setu in 1959.

The 3.19-kilometre (1.98 mi) long Munger Ganga Bridge, 55 km downstream of the Rajendra Setu, under construction in 2012, will link Jamalpur station on the Sahibganj Loop line of Eastern Railway to the Barauni-Katihar section of East Central Railway.

The 4.56-kilometre (2.83 mi) long Ganga Rail-Road Bridge located near Patna, under construction in 2012, will link to Sonepur.


...
Wikipedia

...