*** Welcome to piglix ***

Milan–Venice railway

Milan-Venice railway
Overview
Status Operational
Locale Italy
Termini Milan
Venice
Operation
Opened 1842
Operator(s) RFI
Technical
Track length 267 km (166 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Electrified at 3000 V DC
0.000 Milano Centrale
(From the left: "Genoa" and "Bologna" lines)
To Turin and Chiasso)
Belt line(from Milano Certosa and Greco Pirelli)
3.798 Milano Lambrate
(To Genoa and Bologna)
Belt line(to Milano San Cristoforo)
(From the left: "Venice DD", "Venice LL", "Goods" lines)
Milano Lambrate Scalo goods yard
(Passante linefrom Milano Certosa and Milano Bovisa)
6.240 Lambro junction(staggered junction)
Belt line(from Milano Rogoredo)
Milan ring road east
0.000 Milano Smistamento marshalling yard
9.907 Segrate(since 2003)
12.407 Pioltello-Limito
16.200 Vignate
18.750 Melzo goods yard
19.600 Melzo
(From the left: "Venice DD", "Venice LL" lines)
22.610 Pozzuolo Martesana(since 2009)
24.585 Trece...
Wikipedia

...