Manchester and Salford Junction Canal

Manchester and Salford Junction Canal
M&SJC looking north from the side.jpg
The canal stub viewed north towards the junction with the River Irwell
Specifications
Locks 4
Status Closed
History
Original owner Mersey and Irwell Navigation Company
Principal engineer John Gilbert
Date of first use 1839
Date closed 1922
Geography
Connects to Rochdale Canal
Manchester & Salford J. Canal
River Irwell
Lock 1
Water Street Bridge
Granada Studios car park
Lock 2
Slate Wharf
A56 Deansgate
Transhipment Dock
Locks 3 & 4
Stop Lock
Bridgewater Hall Basin
Rochdale Canal

The Manchester and Salford Junction Canal was a canal in the city of Manchester. It was originally built to provide a direct waterway between the Mersey and Irwell Navigation and the Rochdale Canal. The canal opened in 1839 and was abandoned in 1922.

The lack of any direct canal link between the Mersey and Irwell Navigation and the Rochdale Canal meant that goods being transported using both waterways had to be offloaded onto carts and carried across the city, before being loaded back onto boats to continue their journey. This was costly and time-consuming, as well as adding to traffic congestion on the streets of Manchester.

In 1799 the nearby Manchester Bolton & Bury Canal company proposed to connect their canal to the Rochdale canal with an aqueduct across the Mersey and Irwell Navigation. Due mainly to strong objections from the Mersey and Irwell Navigation, who would have suffered a loss of trade, the link was not forthcoming. In 1805, John Nightingale was asked by the Mersey and Irwell Navigation Company to estimate the cost of a canal link between Manchester and Salford.

Nothing would happen until 1836, when John Gilbert was appointed as engineer. In 1838, just as the canal was being built, the Bridgewater Canal Company were completing their Hulme Locks Branch Canal. This provided an alternative route from the Rochdale Canal to the River Irwell, and cargoes from either direction could navigate onto the Irwell without the need to use the new Junction Canal.

Construction of the new canal was funded in part by the proprietors of the Manchester Bolton & Bury Canal. The canal was opened in 1839. In 1885 the Great Northern Warehouse was built on top of the line of the canal and a dock was constructed to allow the interchange of goods. There were four large bays below the warehouse with two lift shafts to allow goods to be unloaded from the boats using the canal, and raised up to the warehouse for storage.

The canal was constructed just as railways were becoming popular. In later years, both the Bridgewater and Rochdale canals came to be owned by the Manchester Ship Canal Company, removing the competitive incentive for keeping both canals open and the Junction Canal was abandoned in 1922. During the Second World War, sections of the canal were drained and converted for use as air-raid shelters.


...