Maesteg Line | |
---|---|
Overview | |
Type | Heavy Rail |
System | National Rail |
Locale | Bridgend county borough |
Operation | |
Owner | Network Rail |
Technical | |
Number of tracks | Single track |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge |
The Maesteg Line is a commuter rail line in South Wales from Bridgend to Maesteg. Services usually operate from Maesteg to Cheltenham Spa via the South Wales Main Line and Gloucester to Newport Line.
Electrification by 2019 was announced in the Department for Transport's High Level Output Specification of 2012.
The Llynfi and Ogmore Railway (L&OVR) was formed on 28 June 1866 (itself the amalgamation of earlier lines); a standard gauge line as opposed to the main line. On 1 July 1873 the GWR took over the L&OVR.
The line from Bridgend originally operated beyond Maesteg through Caerau and the Cymmer Tunnel, known locally as the 'Gwdihw', to passenger stations in Cymmer, known as Cymmer General and further to Abergwynfi. The lines also connected colleries in Abergwynfi and Glyncorrwg. Junctions at both Tondu and Cymmer connected with east-west routes across the Llynfi and Afan valleys.
The Maesteg branch was closed to passenger trains in 1970 (though it remained in use for coal traffic until 1988), and the link with the Afan Valley was lost due to the closure of the Cymmer Tunnel.
A long campaign in the late 1980s and early 90s, resulted in the reopening of the line in 1992 as far as Maesteg by British Rail and Mid Glamorgan County Council. The new stations and line were officially opened by Prince Richard, Duke of Gloucester and a plaque was unveiled at Maesteg station.