C Columbus visiting Cork Harbour
|
|
History | |
---|---|
Name: | 1997-2012: C. Columbus from 2012: Hamburg |
Owner: | Conti Holding GmbH & Co KG, Munich |
Operator: | 1997-2012: Hapag-Lloyd Kreuzfahrten GmbH, Hamburg from 2012: Plantours & Partner GmbH, Bremen |
Port of registry: | 1996 onwards: Nassau, Bahamas |
Builder: | MTW Schiffswerft GmbH, Wismar, Germany |
Yard number: | 451 |
Laid down: | 5 September 1995 |
Launched: | 30 October 1996 |
Completed: | 17 June 1997 |
In service: | 1997– |
Identification: | IMO number: 9138329 Call sign: C6OX6 MMSI number: 309908000 |
Status: | In service |
General characteristics | |
Type: | Cruise ship |
Tonnage: | 15,067 GT 5,092 NT 1,378 DWT |
Length: | 144.13 m (472 ft 10 in) |
Beam: | 21.50 m (70 ft 6 in) |
Draft: | 5.15 m (16 ft 11 in) |
Depth: | 13.25 m (43 ft 6 in) |
Decks: | 6 |
Ice class: | GL E2 |
Installed power: | 4 × Wärtsilä 6L32 (4 × 2,640 kW) |
Propulsion: | Two controllable pitch propellers |
Speed: | 16 knots (30 km/h; 18 mph) |
Crew: | 170 |
MS Hamburg is a 15,000-ton, 420 passenger, luxury cruise ship owned by the Conti Group and is now operated by Plantours Kreuzfahrten. She was built in 1997, in Wismar, Germany. Her relative small size allows her to transit the Great Lakes in North America, where she cruised seasonally between 1997 and 2011, as well as other cruises worldwide as travelling the Mediterranean for cultural cruises with Martin Randall Travel, the north Atlantic and at Asia. Her crew consists of 170 members, and her top speed is 16 knots. She was previously known as Columbus for Hapag-Lloyd, she was since replaced by Columbus 2.
In April 2015, the vessel suffered damage due to an oil leak. The following trips were canceled in Tanger.
On 5 May 2015, a fishing net became tangled in the ship's propeller off the South East coast of England. The ship was diverted to Southampton to be inspected.
On 11 May 2015, the ship grounded on charted rocks near the New Rocks buoy in the Sound of Mull, Scotland. The official accident report states that Hamburg’s bridge team failed to apply Bridge Team Management tools effectively.
The ship needed to be repaired at a shipyard in Belfast and at Bremerhaven and would be completed by 10 August 2015. To continue operations, Plantours chartered MS Deutschland