M7 (Istanbul Metro)

M7 Kabataş–Mahmutbey
Istanbul public transport - M7 line symbol.png
Overview
Type Rapid transit
System İstanbul Metro
Status Under construction
Locale İstanbul, Turkey
Termini Kabataş
Mahmutbey
Stations 19
Services 1
Line number M7
Operation
Opened 2018; 1 year's time (2018)
Owner İstanbul Metropolitan Municipality
Operator(s) İstanbul Ulaşım A.Ş.
Depot(s) Tekstilkent
Rolling stock 300 Hyundai Rotem
Technical
Line length 24.5 km (15.2 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 1,500 V DC Overhead line
Route map

M7, officially referred to as the M7 Kabataş–Mahmutbey line (Turkish: M7 Kabataş–Mahmutbey metro hattı) is a rapid transit line of the İstanbul Metro system on the European part of Istanbul, Turkey.

Currently, it is under construction. On December 20, 2013, the line was commissioned to Kalyon Group for construction. The groundbreaking ceremony was held on February 9, 2014. The line will be 24.5-kilometre (15.2 mi) long with 19 stations, and is expected to go into service in 2018.

The M7-line will connect eight districts of Istanbul Province, namely Beyoğlu, Beşiktaş, Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar. It is projected that 300 cars of driverless metro trains will transport about one million riders daily. The total travel time will be 31.5 minutes between the end stations. The line will cost Turkish lira symbol 8x10px.png 3.7 billion (approx. US$ 1 billion).


...