Overview | |||
---|---|---|---|
Owner | Istanbul Metropolitan Municipality | ||
Transit type | Tram | ||
Number of lines | 2 (T1 & T4) | ||
Number of stations |
T1: 31 T4: 22 |
||
Daily ridership |
T1: 320,000 T4: 95,000 |
||
Operation | |||
Began operation |
T1: 13 June 1992 T4: 12 September 2007 |
||
Operator(s) | Metro Istanbul | ||
Number of vehicles |
T1: 92 (55 Flexity Swift, 37 Citadis X-04) T4: 78 |
||
Train length | T1: 59 m (194 ft) | ||
Technical | |||
System length | 33.8 km (21.0 mi) (total) T1: 18.5 km (11.5 mi) T4: 15.3 km (9.5 mi) |
||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Electrification | 750 V DC Overhead line | ||
Top speed | T1: 70 km/h (43 mph) | ||
|