Line 5, Ningbo Rail Transit | |
---|---|
5 | |
Overview | |
Type | Rapid transit |
System | Ningbo Rail Transit |
Status | Under construction |
Locale | Ningbo, Zhejiang, China |
Termini |
Buzheng Xingzhuang Road |
Stations | 22 |
Operation | |
Opened | 2021 |
Owner | Ningbo |
Operator(s) | Ningbo Rail Transit Co.,Ltd. |
Character | Underground |
Technical | |
Line length | 27.6 km (17.15 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line under construction in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop. The construction of the first section started on September 28, 2016.
Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.
*Station names might be changed in construction.