*** Welcome to piglix ***

Line 5, Ningbo Rail Transit

Line 5, Ningbo Rail Transit
 5 
Overview
Type Rapid transit
System Ningbo Rail Transit
Status Under construction
Locale Ningbo, Zhejiang, China
Termini Buzheng
Xingzhuang Road
Stations 22
Operation
Opened 2021
Owner Ningbo
Operator(s) Ningbo Rail Transit Co.,Ltd.
Character Underground
Technical
Line length 27.6 km (17.15 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line under construction in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop. The construction of the first section started on September 28, 2016.

Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.

*Station names might be changed in construction.



...
Wikipedia

...