*** Welcome to piglix ***

Line 5, Hangzhou Metro

Line 5
 5 
Overview
Type Rapid transit
System Hangzhou Metro
Status Under consturation
Locale Hangzhou, China
Termini Kejidao
Xiangzhang Road
Stations 38(Phase 1 36, Phase 2)
Services 1
Operation
Planned opening 2019
Owner City of Hangzhou
Operator(s) Hangzhou Metro Corporation
Character Underground and Elevated
Technical
Line length 51.5
(48.6 in Phase 1, 2.9 in Phase 2)
Electrification Third rail, 1,500 V DC

Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line under construction. The line will be 51.5 km long and will ply between Lyuting Road Station in Yuhang District and Xiangzhang Road Station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. Phase 1 of the line is expected to be operational by late 2019. The line is colored cyan on system maps.


...
Wikipedia

...