*** Welcome to piglix ***

Line 4, Ningbo Rail Transit

Line 4, Ningbo Rail Transit
 4 
Overview
Type Rapid transit
System Ningbo Rail Transit
Status Under construction
Locale Ningbo, Zhejiang, China
Termini Cicheng
Dongqian Lake
Stations 25
Operation
Opened 2020
Owner Ningbo
Operator(s) Ningbo Rail Transit Co.,Ltd.
Character Underground / Elevated
Technical
Line length 36.11 km (22.44 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 4 of Ningbo Rail Transit (Chinese: 宁波轨道交通4号线) is a rapid transit line under construction in Ningbo. It starts from Cicheng Town, Jiangbei District, and ends near Dongqian Lake in Yinzhou District. Construction of Line 4 started on November 30, 2015.

Line 4 starts from Cicheng Station in Cicheng Town in east-west direction as an elevated line. Then it turns south into the North External Ring Viaduct where it turns east-west. After reaching Jiangbei Avenue, it starts to turn underground and deviates from the viaduct to Zhuangqiao Railway Station where it turns south, crosses Yaojiang River and reaches Ningbo Railway Station. Then Line 4 goes along Changchun Road, Xingning Road until it reaches Canghai Road and become north-south again. After reaching Shounan Road it turns into southeast direction and reaches Dongqian Lake, its destination.


...
Wikipedia

...