Line 3, Ningbo Rail Transit | |||
---|---|---|---|
3 | |||
Overview | |||
Type | Rapid transit | ||
System | Ningbo Rail Transit | ||
Status | Under construction | ||
Locale | Ningbo, Zhejiang, China | ||
Termini |
Gaotang Bridge Datong Bridge |
||
Stations | 15 | ||
Operation | |||
Opened | 2019 | ||
Owner | Ningbo | ||
Operator(s) | Ningbo Rail Transit Co.,Ltd. | ||
Character | Underground | ||
Technical | |||
Line length | 16.83 km (10.46 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
|
Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line under construction in Ningbo. It starts from south Yinzhou District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District. The construction of the first section, from south Yinzhou to Datong Bridge, started on December 23, 2014.
Line 3 starts from Gaotang Bridge Station in south Yinzhou District as an underground line. Then it turns into east-west direction on Yunzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses Yongtaiwen Railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.
*Station names might be changed in construction.