*** Welcome to piglix ***

Line 3, Chengdu Metro

Line 3, Chengdu Metro
 3 
Overview
Type Rapid transit
System Chengdu Metro
Status Operational
Locale Chengdu, China
Termini Chengdu Junqu General Hospital
Taipingyuan
Stations 17
Services 1
Daily ridership 354,200 (2016 Peak)
Operation
Opened 31 July 2016
Owner Chengdu
Operator(s) Chengdu Metro Limited
Character Underground
Technical
Line length 20.33 km (12.63 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Junqu General Hospital to Taipingyuan. The total length is 20.33 km. Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.


...
Wikipedia

...