Line 17, Shanghai Metro | |||
---|---|---|---|
17 | |||
Overview | |||
Type | Rapid transit | ||
System | Shanghai Metro | ||
Status | Under Construction | ||
Locale | Shanghai, China | ||
Termini |
Hongqiao Railway Station Oriental Land Park |
||
Stations | 13 | ||
Services | 2 | ||
Operation | |||
Opened | 2017 | ||
Technical | |||
Track length | 35.3 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
|
Line 17 of the Shanghai Metro (Chinese: 上海轨道交通17号线) or Qingpu Line (Chinese: 青浦线) runs from Minhang District to Qingpu District. It starts at Hongqiao Railway Station and ends at Oriental Land Park. The total length is 35.2 km. Line 17's color is light red. Line 17 will begin operation in late 2017, from Hongqiao Railway Station to Oriental Land Park.