Line 10, Shenzhen Metro

Line 10
 10 
Overview
Type Rapid transit
System Shenzhen Metro
Status under construction
Locale Shenzhen, China
Termini Futian Checkpoint
Pinghu Center
Stations 23
Operation
Planned opening 2020
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground
Technical
Line length 29.9 km (18.58 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 10 (simplified Chinese: 十号线; traditional Chinese: 十號線; pinyin: Shíhào Xiàn; Jyutping: Sap6 Hou6 Sin3), also known as the Bantian Line (simplified Chinese: 坂田线; traditional Chinese: 坂田線; pinyin: Bǎntián Xiàn; Jyutping: Baan2 Tin4 Sin3) of the Shenzhen Metro began construction at the end of 2015; the line is expected to open in 2020. Line 10 has a length of 29.9 km and a total of 23 stations. It connects the Futian Checkpoint to Pinghu Center.

Line 10 was originally a low priority line to be constructed in the long term future called Line 16. In 2011, the Shenzhen Municipal Government approved the Longgang District Government to start the preliminary work on Line 10. On 2013, the Shenzhen Municipal Government renumbered Line 16 into Line 10 and included it in the Phase III expansion. While the original Shenzhen Metro Line 10 was renumbered to Line 12 planned to be built in Phase IV. This ws done to fast track the line to ease the pressure on Line 4 and accommodate further growth of the Longgang area. In August 2016, planners are proposing the line be designed to handle 8 car trains instead of the original specifications of 6 cars to increase the line's ability to handle the growing passenger demand in Shenzhen.



...