The Joint Systems Manufacturing Center, also known as the Lima Army Tank Plant (LATP) is a tank plant located in Lima, Ohio. It is a government-owned, contractor-operated facility currently operated by General Dynamics Land Systems.

In May 1942 construction began for Lima Army Tank Plant to manufacture centrifugally cast gun tubes in the steel foundry. This manufacturing method was rendered obsolete, so the army converted it to a tank depot for modifying and processing combat vehicles for export and domestic shipping.

In November 1942, a GM subsidiary, United Motors Services, took over operation of the plant to process vehicles under government contract. The plant prepared many vehicles for Europe, including the M5 light tank and the M26 Pershing tank.

After World War II, as the Lima Ordnance Depot, the plant served as a receiving and long-term storage facility for returning combat vehicles. During the Korean War, the plant modified and prepared tanks for shipment.

In 1976, the army selected Chrysler's design for what would become the Abrams tank, and designated the Lima plant, operated by Chrysler, to initially build the tank. The army pressured Chrysler, in financial difficulty, to form a subsidiary, Chrysler Defense, to hold and protect the tank contract from potential bankruptcy proceedings.

In February 1980, the first M1 Abrams rolled out of LATP. After a contract the plant began producing the Abrams at a rate of 30 a month.

Chrysler subsequently sold the Defense subsidiary to General Dynamics in 1982. In January 1985, the last M1 rolled off the assembly line, and in October, production began on the improved M1 (IPM1). The plant later manufactured the M1A1, with the first pilot vehicle built in August 1985. The M1A1 was produced at a rate of 120 a month.

General Dynamics transferred some of the tank maintenance operations to Lima Army Tank Plant when it ended operations at the Detroit Arsenal Tank Plant in December 1996.


...