*** Welcome to piglix ***

Kozhikode Monorail

Kozhikode Metro Rail
Overview
Native name കോഴിക്കോട് മെട്രോ റെയിൽവേ
Locale Kozhikode, Kerala, India
Transit type Mass Rapid Transit
Number of lines 1 (Phase I)
Number of stations 22 (Phase I)
Daily ridership 148,000 (2015- 16 estimate)
Operation
Operation will start
Operator(s) Malabar Metro Rail Corp.
Headway 5 minutes
Technical
System length 44 kilometres (27 mi) (Phase I)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

Kozhikode Light Metro is a proposed mass rapid transport system (MRTS) for the city of Kozhikode (Calicut), in India. In 2010, the State government explored the possibility of implementing a metro rail project for Kozhikode city and its suburbs. The proposal was to have a corridor connecting the Karipur Airport to the Kozhikode Medical College Hospital through the heart of the city. An inception report was submitted by a Bangalore-based consultant, Wilber Smith, on the detailed feasibility study on the prospect of implementing the Mass Rapid Transport System (MRTS) and Light Rail Transit System (LRTS) in the city. However, the project has been scrapped to be replaced by Kozhikode Monorail project. The State Cabinet then decided to form a special purpose vehicle (SPV) to implement monorail projects in Kozhikode and Thiruvananthapuram, and administrative sanction was given in October 2012. The state government issued orders entrusting the Thiruvananthapuram Monorail project to the KMCL on 26 November 2012. The government had handed over the Kozhikode Monorail project to the KMCL prior to that. On 12 June 2013, the State Cabinet gave clearance for an agreement to be signed between KMCL and DMRC, that would make the latter the general consultant for the monorail projects in Kozhikode and Thiruvananthapuram. The DMRC will receive a consultancy fee of 3.25% of the 55.81 billion ( 35.90 billion for Thiruvananthapuram and 19.91 billion for Kozhikode). The agreement was signed on 19 June 2013. However, due to cost overrun and the cold response from the bidders the project was put on hold. Bombardier Transportation was the only bidder for the project. The project was later scrapped and Light metro was proposed.

The Union Urban Development Ministry decided to consider the proposal for a Metro in Kozhikode after the success of the Delhi Metro and signed up for drawing the detailed project report (DPR) of the Rs.27.71 billion Kozhikode metro transport project with Delhi Metro Rail Corporation as a feasibility study for the introduction of suburban services in Kozhikode city. The Ministry decided to bear 50% of the cost of the preparation of the DPR for the city that comes under the population cut-off bracket. The preliminary feasibility study had been carried out by the National Transportation Planning and Research Centre (NATPAC) in association with the Kerala Road Fund Board in December 2008. Based on this feasibility report, the Board entrusted Wilber Smith to conduct the study in June 2009. Already, the NATPAC has submitted a metro rail project covering a total distance of 32.6 km from Karipur to the Calicut Medical College. The cost of the project was estimated at Rs. 27.71 billion and was expected be completed within five years. The monorail project which replaced the metro rail project was estimated to cost Rs 1,991 crore has received a bid from the lone bidder Bombardier consortium, and was almost double of the estimate. The project was scrapped and the Light Metro has been approved.


...
Wikipedia

...