*** Welcome to piglix ***

King George Square busway station

King George Square
K george square station.jpg
Location King George Square, Brisbane
Coordinates 27°28′07″S 153°01′27″E / 27.468603°S 153.024136°E / -27.468603; 153.024136Coordinates: 27°28′07″S 153°01′27″E / 27.468603°S 153.024136°E / -27.468603; 153.024136
Owned by Department of Transport & Main Roads
Operated by Brisbane Transport
Line(s) Northern Busway
Platforms 2
Bus stands 12
Construction
Structure type Underground
Bicycle facilities King George Square Cycle Centre
Disabled access Yes
Other information
Station code translink.com.au/stop/010781 (platform 1A)
translink.com.au/stop/010783 (platform 1B)
translink.com.au/stop/010785 (platform 1C)
translink.com.au/stop/010787 (platform 1D)
translink.com.au/stop/010789 (platform 1E)
translink.com.au/stop/010791 (platform 1F)
translink.com.au/stop/010780 (platform 2A)
translink.com.au/stop/010782 (platform 2B)
translink.com.au/stop/010784 (platform 2C)
translink.com.au/stop/010786 (platform 2D)
translink.com.au/stop/010788 (platform 2E)
translink.com.au/stop/010790 (platform 2F)
Fare zone go card 1
Website TransLink
History
Opened 19 May 2008
Services
Preceding station   TransLink   Following station
Terminus
Northern Busway
toward RWBH (current) and
Bracken Ridge (proposed)

King George Square busway station is located in Brisbane, Australia serving the Brisbane central business district. It is located beneath King George Square and marks the start of the Northern Busway. The station has twelve stops on two platforms; access to these platforms is via an underground concourse which can be accessed from Ann Street or Adelaide Street. Passengers wait behind automatic doors on the stop that is assigned to their bus. It opened on 19 May 2008.

Construction of the King George Square busway station was announced in March 2005. Construction commenced in early 2006 and the station opened on 19 May 2008 when the Northern Busway was extended from Normanby. The lower two levels of the King George Square Car Park were demolished to make way for the station. The heritage-listed Wheat Creek Culvert (built in 1861) which ran from under King George Square out into Adelaide Street was also demolished. A short segment of the culvert has been preserved as a display in the bus station.

A bus tunnel has been constructed under Albert Street to link the station with Queen Street bus station. The bus tunnel replaced one of the tunnel exit ramps to the Queen Street station on Albert Street (see photo below). As part of construction, the space in Albert Street above the new tunnel has been converted into a pedestrian mall extending the Queen Street Mall.

In conjunction with the building of the station, there was a national design competition for the redevelopment of King George Square. The winning entry was entitled A Space in Transition by UrbisJHD. Construction of the Square was completed in October 2009. The re-design of the square and its busway entrances attracted criticism from professional urban designers and the public.


...
Wikipedia

...