*** Welcome to piglix ***

Khanbumbat Airport

Umnugobi Khanbumbat Airport
Ханбумбат нисэх буудал
Oyu Tolgoi logo.jpg
Khanbumbat Airport (Oyu Tolgoi Airport) 05.jpg
Summary
Airport type Public
Owner Oyu Tolgoi LLC
Operator ACH Services LLC
Serves Khanbogd
Location Khanbogd, Ömnögovi, Mongolia
Elevation AMSL 1,196 m / 3,924 ft
Coordinates 43°08′05″N 106°50′47″E / 43.13472°N 106.84639°E / 43.13472; 106.84639Coordinates: 43°08′05″N 106°50′47″E / 43.13472°N 106.84639°E / 43.13472; 106.84639
Website http://ot.mn/
Map
ZMKB is located in Mongolia
ZMKB
ZMKB
Location within Mongolia
Runways
Direction Length Surface
m ft
15/33 3,250 10,663 Concrete PCN 57/R/B/W/T
--/--  ?  ? Concrete
Statistics (2014)
Passengers 57,597
Sources: Civil Aviation Administration of Mongolia and the MCAA
Passengers 57,597

Khanbumbat Airport (Mongolian: Ханбумбат нисэх буудал, also Oyu Tolgoi Airport) is an airport in Khanbogd, Ömnögovi, Mongolia. The airport's construction was funded by the adjacent Oyu Tolgoi mine. It is the second airport in passenger traffic in Mongolia after Chinggis Khaan International Airport. The airport serves nearly 100,000 passengers annually.

Canadian-based Ivanhoe Mines discovered the gold-copper ore deposit in 2001 in the Gobi Desert of Mongolia. It is in an area known as Oyu Tolgoi (Mongolian for Turquoise Hill), where in the time of Genghis Khan outcropping rocks were smelted for copper. By 2003 there were 18 exploration drill rigs on the property employing approximately 200 people, and Oyu Tolgoi was the "biggest mining exploration project in the world." In January 2013 Oyu Tolgoi started producing concentrate from the mine.

The old building of the airport was built in 2000-s. In 2004 the airport was called "Oyut Airport". The runway was dirt. In 2007 it started accepting passenger flights. The new airport was built in 2012. It opened on 10 February 2013.

The Khanbumbat Airport and Oyu Tolgoi mine is in the South Gobi Desert of Mongolia, 80 kilometres (50 mi) north of Mongolia's border with the People's Republic of China, where the mined copper is expected to be shipped. Oyu Tolgoi deposits contain (as of 2010) an estimated 79 billion pounds (35,833,000 tonnes) of copper, and 45 million ounces (1,275,000,000 grams) of gold. Production is scheduled to begin in 2013 and to reach full capacity in 2018. Over the anticipated lifespan of the mine (45 years), Oyu Tolgoi is scheduled to produce 450,000 tonnes (500,000 short tons) of copper per year, an amount equal to 3% of global production. Oyu Tolgoi is also expected to produce 330,000 ounces of gold annually. Rio Tinto intends to employ 3,000-4,000 people from Mongolia, so it was a need to build an airport. Khanbumbat Airport is located 207 kilometers northwest of the regional capital of the Dalanzadgad, and 522 kilometers southwest of the national capital of Ulan Bator.


...
Wikipedia

...