Kentucky Route 15 | ||||
---|---|---|---|---|
Route information | ||||
Maintained by KYTC | ||||
Length: | 131.418 mi (211.497 km) | |||
Major junctions | ||||
South end: | US 119 in Whitesburg | |||
Hal Rogers Parkway / KY 80 in Hazard Mountain Parkway in Campton Mountain Parkway / KY 82 in Clay City |
||||
North end: | US 60 in Winchester | |||
Location | ||||
Counties: | Letcher, Knott, Perry, Breathitt, Wolfe, Powell, Clark | |||
Highway system | ||||
|
Kentucky Route 15X | |
---|---|
Location: | Whitesburg, Letcher County |
Length: | 2.838 mi (4.567 km) |
Kentucky Route 15 Connector |
|
---|---|
Location: | Whitesburg, Letcher County |
Length: | 0.24 mi (0.386 km) |
Kentucky Route 15 Business |
|
---|---|
Location: | Hazard, Perry County |
Length: | 2.306 mi (3.711 km) |
Kentucky Route 15 begins at a junction of US 119/Corridor F & Business KY 15 in Whitesburg, and terminates in Winchester at US 60. It is a major route, connecting the coalfields of the Cumberland Plateau with Lexington and other cities in the Bluegrass region. The segment from Whitesburg to KY 15 at Campton, which in turn connects to the Bert T. Combs Mountain Parkway near the town, is also the primary part of Corridor I of the Appalachian Development Highway System.
Currently, KY 15 is being relocated onto a new four-lane divided alignment in phases. Construction on section 17 of the relocation project is from KY 205 at Vancleve to Fivemile; construction began on January 6, 2005 at a cost of $36.4 million and is 100% complete. Work is also progressing on section 16 from Fivemile to Wolverine; construction began on November 2, 2006 with a projected cost of $4.7 million and is approximately 95% complete. There are additional plans to reconstruct the segment from Jackson south to Hazard on new alignment beginning in 2008.