Kazipet–Vijayawada section
Kazipet–Vijayawada section |
Kazipet Junction is the place where Hyderabad-New Delhi line meets the Chennai-New Delhi line
|
Overview |
Status |
Operational |
Termini |
Kazipet Vijayawada
|
Operation |
Opened |
1889 |
Owner |
Indian Railway |
Operator(s) |
South Central Railway |
Depot(s) |
Kazipet, Vijayawada |
Rolling stock |
WDM-2, WDM-3A, WDG-3A, WDG-4 , WDM-2, WDP-1 diesel locos; WAG-7, WAG-5 and WAM-4 electric locos. |
Technical |
Track length |
218 km (135 mi) |
Number of tracks |
2 |
Track gauge |
1,676 mm (5 ft 6 in) broad gauge
|
Electrification |
1985-88 |
Operating speed |
up to 160 km/h |
Kazipet–Vijayawada section
|
|
km / 0 |
Kazipet, to Nagpur-Hyderabad line
|
|
10 |
Warangal |
|
15 |
Vanchangiri |
|
23 |
Chitapalli |
|
30 |
Yelgur |
|
40 |
Nekonda |
|
49 |
Intakanne |
|
55 |
Kesamudram |
|
62 |
Tadla Pusapalli |
|
70 |
Mahbubabad |
|
82 |
Gundratimadugu |
|
90 |
Garla |
|
95 |
Dornakal |
|
|
|
|
9 |
Pocharam |
|
16 |
Karepalli |
|
|
Madharam dolomite mines |
|
|
Yellandu (Singerani collieries) |
|
21 |
Gandhipuram (Halt) |
|
38 |
Chimal Pahad |
|
43 |
Tadakalpudi |
|
50 |
Bethampurdi |
|
54 |
Bhadrachalam Road |
|
|
Wikipedia
...
| |