Karachi Shipyard

Karachi Shipyard & Engineering Works Ltd.
Native name
Urdu: کراچی شپ یارڈ اینڈ انجینئرنگ ورکس
State owned enterprise
Industry Shipbuilding, Defence
Founded 1957; 60 years ago (1957)
Headquarters Karachi, Sindh, Pakistan
Area served
Asia
Key people
Syed Hasan Nasir Shah (CEO)
Products Warships, Merchant vessels, Barges, Tugboats, Dredgers, Floating Drydocks
Owner Ministry of Defence Production
Website www.karachishipyard.com.pk

The Karachi Shipyard & Engineering Works Limited (KS&EW), is a major defence contractor and military corporation situated in West Wharf in Karachi, Pakistan.

Karachi Shipyard and Engineering Works was established in mid fifties as a project of Pakistan Industrial Development Corporation (PIDC) and incorporated as a public limited company in 1957, managed by a Board of Directors with Managing Director as the Chief Executive.

Karachi Shipyard is situated at west wharf Karachi and spread over an area of 71 acres. It has a large shipbuilding hall, three block fabrication areas, three shipbuilding berths, two dry docks, a well equipped machine shop and a large grit blasting and painting facility with modern machinery for paint application under controlled environment as per international standards. A ship lift and transfer system with a lifting capacity of 7881 tons and 13 in number parking stations is being installed which is planned to complete by end 2016.

Karachi Shipyard is the only shipyard and oldest heavy engineering establishment of Pakistan, catering for shipbuilding, ship repair and general heavy engineering. It has played a historical role in transferring of technologies and broadening the industrial base of country.

Karachi Shipyard is the only shipbuilding company in Pakistan. It has built numerous cargo ships, oil tankers, tugboats and support vessels, landing crafts, naval vessels and submarines.

Karachi Shipyard has recently completed building 17000 tons Fleet Tanker for Pakistan Navy. The construction of the vessel started on 27 November 2013 with steel cutting and subsequently keel laying was performed on 7 March 2014. The construction of the vessel was completed and it was launched on August 19, 2016 by Prime Minister of Pakistan.

PNFT will provide not only logistic support to PN units at high seas but can also undertake ASW/ASvW operation through embarked helicopter. PNFT will be built under the Class and will comply with IMO and MARPOL regulations envogue. For this, the ship is of double hull configuration. It is propelled by two diesel driven engines with controllable pitch propeller and can achieve a top speed of 20 knots. There are 4 x DGs for electrical power generation. With overall length of 158.4 m and maximum width of 22.0 m, the ship has scantling displacement of 17000 tons.

Contract for indigenous construction of a Fleet Tanker for Pakistan Navy was signed on 22 Jan 2013 between Ministry of Defence Production (MoDP), Pakistan and M/s STM of Turkey. As per the said contract, design of the ship alongwith Kit of Material (KoM) will be provided by M/s STM, whereas complete construction, outfitting, and trials will be undertaken by KS&EW. PN Fleet Tanker (PNFT) is the largest warship to be built in country to date.


...