*** Welcome to piglix ***

John Euliano Park

John Euliano Park
JayBergmanField.jpg
Former names Jay Bergman Field (2001-2016)
Location Orlando, Florida, U.S.
Coordinates 28°36′34″N 81°11′46″W / 28.609435°N 81.196105°W / 28.609435; -81.196105Coordinates: 28°36′34″N 81°11′46″W / 28.609435°N 81.196105°W / 28.609435; -81.196105
Owner University of Central Florida
Operator University of Central Florida
Capacity 3,600
Record attendance 4,319
Field size Left Field: 320 feet (98 m)
Left-Center Field: 360 feet (110 m)
Center Field: 390 feet (119 m)
Right-Center Field: 360 feet (110 m)
Right Field: 320 feet (98 m)
Surface Natural Grass
(Bermuda grass)
Scoreboard 22 feet (6.7 m) x 11 feet (3.4 m)
Construction
Opened February 3, 2001
Construction cost $2,834,576
Architect DLR Group
Main contractors Eby
Tenants
UCF Knights Baseball (NCAA) (2001–present)

John Euliano Park, formerly Jay Bergman Field, is a baseball stadium located on the main campus of the University of Central Florida in Orlando, Florida, USA. The stadium serves as the home of the UCF Knights baseball team.

John Euliano Park was originally built in 2001 as a state-of-the-art facility, featuring an indoor training facility with three batting cages and two pitching mounds. The facility was named after the former head coach of the team, Jay Bergman. However, UCF relieved Jay Bergman of his duties on May 1, 2008 for alleged harassment towards an equipment manager.

In 2013, the Knights ranked 43rd among Division I baseball programs in attendance, averaging 1,457 per home game. The facility's single-game record attendance of 3,678 was set during a game against the #17 Florida Gators on February 19, 2013; the Knights lost the game 5-3.

Jay Bergman's name remained on the park until August 22, 2016, when it was renamed for alumnus John Euliano. Euliano had given UCF Atletics a gift of $1.5 million for renovation of the stadium. The latest round of renovation will begin following the 2017 season.

Since moving into Jay Bergman Field in 2001, the Knights own a 222–123 (.643) record.

Beginning in late 2011, Jay Bergman Field underwent the first phase of a two-phase expansion, designed to increase the total capacity from 1,800 to 4,180.

The first phase involved construction of new lower-level bleachers along the first base line, replacing part of the grass berm. Additionally, a second level was added above the concourse on the first base side. Approximately 1,000 additional fans can be accommodated on grass berms along the sides of left and right field, and in a "Party Deck" just beyond the right field fence. The total capacity for the 2012 and 2013 seasons is approximately 3,600 fans.

Due to monetary issues, the original plans for the second phase of expansion were scaled back. The current plan, expected to begin construction following the 2013 UCF baseball season, includes an elevated press box, outdoor club level seating, and two loge boxes. After the second phase of expansion, total capacity is expected to be around 3,900 (a reduction of approximately 300 seats from the original plan).


...
Wikipedia

...