Location Western Tasmania
Coordinates 42°09′21″S 145°32′04″E / 42.15583°S 145.53444°E / -42.15583; 145.53444Coordinates: 42°09′21″S 145°32′04″E / 42.15583°S 145.53444°E / -42.15583; 145.53444
Purpose Power
Status Operational
Opening date 1991 (1991)
Owner(s) Hydro Tasmania
Dam and spillways
Type of dam Embankment dam
Impounds King River
Height 83 metres (272 ft)
Length 245 metres (804 ft)
Width (crest) 300 millimetres (12 in)
Dam volume 770×10^3 m3 (27×10^6 cu ft)
Spillways 1
Spillway type Controlled and uncontrolled
Spillway capacity
  • 245 m3/s (8,700 cu ft/s) chute on dam face
  • 190 m3/s (6,700 cu ft/s) valve in tunnel
Reservoir
Creates Lake Burbury
Total capacity 1,081,420 ML (38,190×10^6 cu ft)
Active capacity 1,065,000 ML (37,600×10^6 cu ft)
Catchment area 559 km2 (216 sq mi)
Surface area 53,250×10^3 m2 (573.2×10^6 sq ft)
John Butters Power Station
Operator(s) Hydro Tasmania
Commission date 1992 (1992)
Type Conventional
Hydraulic head 184 metres (604 ft)
Turbines 1 x 144 MW (193,000 hp)
Fuji Francis turbine
Installed capacity 144 megawatts (193,000 hp)
Capacity factor 0.9
Annual generation 576 gigawatt-hours (2,070 TJ)
Website
hydro.com.au/energy/our-power-stations/king-yolande

The John Butters Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia. The power station forms part of the King – Yolande River Power Scheme and is owned and operated by Hydro Tasmania.

Part of the King – Yolande scheme that comprises three hydroelectric power stations, the John Butters Power Station is fed by water from Lake Burbury which is dammed by the Crotty Dam in the gap in the West Coast Range between Mount Jukes and Mount Huxley, and to the south by Darwin Dam. Water flow to the station is via a long headrace tunnel from the Crotty Dam via a 6.5-kilometre (4.0 mi)-long headrace tunnel and a 500-metre (1,600 ft)-long steel lined power tunnel.

The power station was commissioned in 1992 by the Hydro Electric Corporation (TAS), one of the last power stations constructed before its disaggregation and transformation to Hydro Tasmania. The station has one Fuji Francis turbines with a generating capacity of 144 megawatts (193,000 hp) of electricity. Within the station building, the turbine has a half embedded spiral casing controlled via a spherical rotary inlet valve and a vertical lift, gravity closed intake gate designed to cut off full flow. The station output, estimated to be 576 gigawatt-hours (2,070 TJ) annually, is fed to TasNetworks' transmission grid via a 13.8 kV/220 kV three-phase Fuji generator transformer to the outdoor switchyard.


...