The Jari project was an attempt to create a tropical tree farm in Brazil for producing pulp for paper.

The Jari project was a brainchild of US entrepreneur and billionaire Daniel K. Ludwig. In the 1950s he noticed that demand for paper was rising. Since the forests of the temperate zone were already in use, the supply of the wood pulp for paper was fixed. Ludwig foresaw a future increase in the price of paper due to the increase of mass media. Since most of the natural forest timber was not suitable for paper production, Ludwig planned a site where the natural forest would be replaced by a tree farm. It would have to be started decades ahead to supply the future paper production.

Ludwig selected the fast-growing tropical tree Gmelina arborea for his tree farm. At first he considered locating his tree farm in Costa Rica but the Brazilian military government encouraged him to settle on the lower reaches of the Rio Jari, a tributary of the Amazon River. In 1967, Ludwig bought 1.6 million acres (6,475 km²) for $3 million.

Ludwig controlled the project mainly from the United States. He built a settlement, Monte Dourado, with houses, schools, hospitals, nurseries, bridges and community buildings. He also built roads and railways. The clearing of the land using heavy bulldozers damaged the topsoil the trees were to be planted in. It became necessary to employ local workers instead for land clearing. The soil turned out to be partially unsuitable for Gmelina. Also, the new trees were damaged by the numerous insects living in the area of the Amazon. Other settlements, the "free cities" of Beiradão and Beiradinho, were built to house workers. In its heyday, the Jari Project had 35,000 workers.

Ludwig had also commissioned two large ship-shaped platforms that were built in Japan and floated to the Jari Project. One barge module contained the pulping sector of the pulp mill. This module housed the digesting the the bleach plant and the pulp machine. The second module housed the recovery boiler, the evaporators and the recaust. The pulp mill barge was finished in 1978 and launched on 1 February. It travelled through the Indian Ocean and around the Cape of Good Hope, arriving at the Brazilian city of Munguba on 28 April. The power group module arrived four days later. Both barges were floated into specially built locks. Hundreds of gum wood piles had been driven into the ground to support the two barges. By closing the locks and pumping the water out, the barges gently settled on the many piles.


...