*** Welcome to piglix ***

Jakarta–Serpong Toll Road

Jakarta–Serpong Toll Road
Route information
Maintained by PT Jasa Marga (Persero) Tbk & PT Nusantara Infrastructure Tbk
Length: 12.0 km (7.5 mi)
Major junctions
Northeast end: Ulujami
  Jakarta Outer Ring Road
Jakarta Outer Ring Road 2 (Planned)
Serpong-Balaraja Toll Road (Planned)
Southwest end: Serpong
Location
Major cities: South Tangerang
Highway system
Roads and Highways in Indonesia

Jakarta-Serpong toll road is a toll road connecting BSD City and Jakarta. The length of the toll road is 13.5 Kilometres (8.4 miles). The toll road was built by Indonesia's largest toll road company, PT. Jasamarga Tbk.

It is divided into two parts which operated now and other parts planned. The first part is from Ulujami to Pondok Ranji which is owned and operated by PT Jasamarga Tbk, whereas the second part lies from Pondok Ranji to Serpong. This part is owned by PT Bintaro Serpong Damai (BSD) but operated by PT Jasamarga (Persero) Tbk. From Ulujami to Serpong, there are 3 exits, the first being the main Pondok Ranji toll gate, the second being East BSD, and last being Serpong. From Serpong to Ulujami, 3 exits are available. First is East BSD, second is West Pondok Ranji Toll Gate, the last is Bintaro sector 3. Another part of this highway will be built soon. The third part is from Rawabuntu to Malang Nengah, whereas the fourth part lies from Malang Nengah to Citra Raya and the fifth part lies from Citra Raya to Pasar Kemis. From Pasar Kemis, the toll road will continue until Soekarno–Hatta International Airport, passing Sepatan & Teluk Naga. On April 19, 2012 afternoon till night, the BSD toll road around Pondok Ranji was flooded with 80 centimeters of water from the Deker River. This caused a heavy traffic jam until the flood receded.

Fees are charged in Rupiah as regulated by Minister of Public Work Act No. 514/KPTS/M/2009 31 August 2009 in the table shown below.

West:
Serpong
Parung
East:
BSD City
Jelupang
Tangerang



...
Wikipedia

...