Holyrood stop
|
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Edmonton LRT station | |||||||||||
Coordinates | 53°31′40″N 113°27′27″W / 53.52778°N 113.45750°WCoordinates: 53°31′40″N 113°27′27″W / 53.52778°N 113.45750°W | ||||||||||
Owned by | City of Edmonton | ||||||||||
Platforms | Side-loading platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Surface | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opening | 2020 | ||||||||||
Services | |||||||||||
|
|||||||||||
|
Holyrood stop is a tram stop under construction in the Edmonton Light Rail Transit network in Edmonton, Alberta, Canada. It will serve the Valley Line, and is located on the east side of 85 Street, staggered on either side of 93 Avenue, between Strathearn and Holyrood. The stop is scheduled to open in 2020.