*** Welcome to piglix ***

Heydar Aliyev International Airport

Heydar Aliyev International Airport
Heydər Əliyev adına beynəlxalq hava limanı
Baku Airport Logo.png
Международный аэропорт Гейдар Алиев.jpg
  • IATA: GYD
  • ICAO: UBBB
    GYD is located in Azerbaijan
    GYD
    GYD
    Location of airport in Azerbaijan
Summary
Airport type Public
Owner Government of Azerbaijan
Operator Government
Serves Baku
Location Baku, Azerbaijan
Hub for
Elevation AMSL 3 m / 10 ft
Coordinates 40°28′03″N 050°02′48″E / 40.46750°N 50.04667°E / 40.46750; 50.04667
Website airport.az
Runways
Direction Length Surface
m ft
16/34 2,700 8,858 Asphalt/Concrete
17/35 3,200 10,499 Asphalt/Concrete
Statistics (2014)
Passengers 2,966,725
Passenger change 13–14 Increase3.9%
Aircraft movements 34,794
Movements change 13–14 Increase5.9%
Source: [1] www.airportbaku.com, Azerbaijanian AIP at EUROCONTROLACI's 2014 World Airport Traffic Report.
Passengers 2,966,725
Passenger change 13–14 Increase3.9%
Aircraft movements 34,794
Movements change 13–14 Increase5.9%

Baku Heydar Aliyev International Airport (Azerbaijani: Heydər Əliyev Beynəlxalq hava limanı) is one of the six international airports serving Azerbaijan. Formerly, it was called Bina International Airport by the name of a suburb in Baku. On March 10, 2004, the airport was renamed in honor of National Leader Heydar Aliyev, the third President of Azerbaijan. The airport is located 20 kilometers northeast of Baku, connected to the city by a modern highway, which was put into operation in 2008. It is the busiest airport in Azerbaijan and of the Caucasus. The airport serves as the home base for flag carrier Azerbaijan Airlines and its subsidiary AZALJet as well as freight carrier Silk Way Airlines.

Two passenger terminals (International Terminal 1 and Domestic Terminal 2) and two cargo terminals operate at Heydar Aliyev International Airport. The old terminal built in Soviet times, was entirely demolished and replaced by the new Terminal 1. The four-level engineering concept was developed in July 2010 by Arup company, with a tricorn shape and semi transparent roof. The total area is 65,000 square meters. The interior, designed by Turkish company AUTOBAN, has a series of oak-veneer 'cocoons'.

Terminal 1, commissioned in April 2014, has twelve aerobridge equipped parking bays. The terminal is designed for 6 million passengers per year. It currently serves up to 3 million passengers per year. Terminal 2, which now only serves domestic flights, was completed in 1989.

The airport has two runways; Runway 16/34 is 2,700 by 60 m (8,858 by 197 ft), Runway 17/35 is 3,200 by 45 m (10,499 by 148 ft).

A hotel with 205 rooms is located at the airport.

Access to the city centre by a car either on the airport highway through Heydar Aliyev Avenue, or on Zikh highway through Nobel Avenue. Parking lots designed for more than 1,600 cars in total, are available in front of each terminal.


...
Wikipedia

...