*** Welcome to piglix ***

Hau Nui Wind Farm

Hau Nui Wind Farm
Hau Nui Wind Farm stage 1 from Range Road.JPG
The seven stage 1 turbines from Range Road
Hau Nui Wind Farm is located in New Zealand
Hau Nui Wind Farm
Location of Hau Nui Wind Farm in New Zealand
Country New Zealand
Location south-east of Martinborough, Wellington region
Coordinates 41°21′42″S 175°29′2″E / 41.36167°S 175.48389°E / -41.36167; 175.48389Coordinates: 41°21′42″S 175°29′2″E / 41.36167°S 175.48389°E / -41.36167; 175.48389
Status Operational
Commission date 1996 (1996), 2004
Owner(s) Genesis Energy
Wind farm
Type Onshore
Hub height 46 m (151 ft)
Rotor diameter 40 m (131 ft)
Power generation
Units operational 15
Make and model Enercon: E-40
Nameplate capacity 8.65 MW
Capacity factor 29.0%
Annual output 22 GWh
Website
www.genesisenergy.co.nz/hau-nui-wind-farm

The Hau Nui Wind Farm is a 15-turbine wind farm located approximately 21 kilometres (13 mi) south-east of Martinborough, in the South Wairarapa District of New Zealand. Hau Nui (Māori for "big wind") was the first wind farm built in New Zealand.

The wind farm was built in two stages and the completed capacity is 8.65 MW.

Hau Nui wind farm is located on a ridge adjacent to White Rock Road, the main road between Martinborough and White Rock. Stage 1 is situated on Range Road near its intersection with White Rock Road. Stage 2 is located approximately one kilometre south of Stage 1 on Range Road.

The site has an average wind speed of 9.2–9.5 metres per second (30–31 ft/s).

Hau Nui has a total of fifteen Enercon E-40 wind turbines. The seven Stage 1 turbines are third-generation turbines, delivering 550 kW each. The eight Stage 2 turbines are later versions of the same Enercon E-40 model, each generating 600 kW each.

The turbines in both stages are 46 metres (151 ft) tall to the hub, and have rotor diameters of 40 metres (131 ft).

Electricity generated by Hau Nui is injected into the local distribution grid. The 400V electricity generated by each turbine is stepped up by transformers at the base of the turbine - to 11,000V for stage 1 turbines and 33,000V for stage 2 turbines.

33kV lines from stage 2 take electricity 24 kilometres (15 mi) to Martinborough to supply the town. Stage 1 turbines connect to 11 kV lines to supply the local area, or connect to the Stage 2 to Martinborough 33 kV lines through a 750 kVA transformer to the north side of the stage.

During peak demand, electricity generated by Hau Nui is used by Martinborough and the eastern South Wairarapa district. During off-peak, Hau Nui electricity can supply the entire South Wairarapa district via 33kV lines connecting Martinborough with Featherston, Greytown, and Pirinoa. If local demand is low, some electricity may be exported to the national grid through Transpower's Greytown substation.


...