Metro Green Line train at Redondo Beach Station.
|
|
Overview | |
---|---|
Owner | Metro Rail |
Transit type | Light rail |
Line number | 803 |
Number of stations | 14 |
Daily ridership | 36,141 (July 2016; avg. weekday) |
Website | Green Line |
Operation | |
Began operation | August 12, 1995 |
Operator(s) | Los Angeles County Metropolitan Transportation Authority |
Character | Predominantly elevated and fully grade-separated, mostly in freeway median. |
Number of vehicles | Siemens P2000 |
Train length | 1–2 vehicles |
Technical | |
System length | 20.0 mi (32.2 km) |
No. of tracks | 2 |
Track gauge |
4 ft 8 1⁄2 in (1,435 mm) (standard gauge) |
Electrification | 750 V DC overhead catenary |