Gorakhpur Junction
गोरखपुर जंक्शन |
|
---|---|
Regional rail and Light rail station | |
Gorakhpur Railway Station
|
|
Location | Station Road, Gorakhpur, Uttar Pradesh India |
Coordinates | 26°45′35″N 83°22′54″E / 26.7598°N 83.3818°ECoordinates: 26°45′35″N 83°22′54″E / 26.7598°N 83.3818°E |
Elevation | 84 metres (276 ft) |
Owned by | Indian Railways |
Operated by | North Eastern Railway, Lucknow NER Railway Division |
Line(s) |
Barauni–Gorakhpur, Raxaul and Jainagar lines Muzaffarpur- Gorakhpur line (via Hajipur, Raxaul and Sitamarhi) Muzaffarpur-Gorakhpur main line Gorakhpur-Lucknow Kanpur Delhi main line Gorakhpur-Nautanwa-Barhni line |
Platforms | 10 |
Tracks | 26 |
Construction | |
Structure type | Standard on ground |
Parking | Available |
Bicycle facilities | Available |
Other information | |
Status | Functioning |
Station code | GKP |
Zone(s) | North Eastern Railway |
Division(s) | Lucknow NER Railway Division, Varanasi Division & Izzatnagar Division |
History | |
Opened | 1890 |
Electrified | Yes |
Traffic | |
Passengers | 365000 |
Location | |
The North east Gorakhpur Railway Station is located in the city of Gorakhpur in the Indian state of Uttar Pradesh. It serves as the headquarters of the North Eastern Railway. The station offers Class A railway station facilities. On 6 October 2013, Gorakhpur became the world's longest railway platform, after inauguration of the remodelled Gorakhpur Yard, with a stretch of around 1.34 kilometres (0.84 mi).
The Gorakhpur city area is served by 10 local railway stations other than Gorakhpur Junction, namely, Gorakhpur cantt, Domingarh, Sahjanwa, Sihapar, Maniram, Nakaha jungle, Kushmi, Jagatbela, and Unaula.
The 135-mile (217 km) metre-gauge Gonda loop, running between Gorakhpur and Gonda, was constructed by the Bengal and North Western Railway between 1886 and 1905. The 79-mile (127 km) Kaptanganj–Siwan metre-gauge line was opened in 1913. The 25-mile (40 km) metre-gauge Nautanwa branch line was opened in 1925.
Conversion to broad gauge started with the Gorakhpur–Siwan section in 1981. The Gorakhpur–Paniyahwa section was converted in 1991. The Gorakhpur–Gonda loop was converted around 1985, and the Nautanwa branch line at about the same time. The Kaptanganj–Siwan line was converted around 2006. Now Gorakhpur would have three new platforms. At present, Gorakhpur has the world's longest platform.
Gorakhpur is amongst the top hundred booking stations of Indian Railways. It handles over 189 trains daily. This is the route which connects Bihar to Delhi , the other route which connect is Banaras route. Some of the other railway stations in Uttar Pradesh handling large numbers of passengers are Kanpur Central,Varanasi Junction,Mathura Junction and Mughalsarai.