History | |
---|---|
Nazi Germany | |
Name: | U-331 |
Ordered: | 23 September 1939 |
Builder: | Nordseewerke, Emden |
Yard number: | 203 |
Laid down: | 26 January 1940 |
Launched: | 20 December 1940 |
Commissioned: | 31 March 1941 |
Fate: | Sunk, 17 November 1942 |
General characteristics | |
Class and type: | Type VIIC submarine |
Displacement: |
|
Length: |
|
Beam: |
|
Height: | 9.60 m (31 ft 6 in) |
Draught: | 4.74 m (15 ft 7 in) |
Installed power: |
|
Propulsion: |
|
Speed: |
|
Range: | |
Test depth: |
|
Complement: | 4 officers, 40–56 enlisted |
Armament: |
|
Service record | |
Part of: |
|
Commanders: |
|
Operations: |
|
Victories: |
German submarine U-331 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
The submarine was laid down on 26 January 1940 at the Nordseewerke yard at Emden, launched on 20 December 1940, and commissioned on 31 March 1941 under the command of Oberleutnant zur See Hans-Diedrich Freiherr von Tiesenhausen. She was tracked by the RAF and crippled before being destroyed by the Royal Navy Fleet Air Arm in late 1942 with the loss of most of her crew.
German Type VIIC submarines were preceded by the shorter Type VIIB submarines. U-331 had a displacement of 769 tonnes (757 long tons) when at the surface and 871 tonnes (857 long tons) while submerged. She had a total length of 67.10 m (220 ft 2 in), a pressure hull length of 50.50 m (165 ft 8 in), a beam of 6.20 m (20 ft 4 in), a height of 9.60 m (31 ft 6 in), and a draught of 4.74 m (15 ft 7 in). The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of 2,800 to 3,200 metric horsepower (2,060 to 2,350 kW; 2,760 to 3,160 shp) for use while surfaced, two AEG GU 460/8–27 double-acting electric motors producing a total of 750 metric horsepower (550 kW; 740 shp) for use while submerged. She had two shafts and two 1.23 m (4 ft) propellers. The boat was capable of operating at depths of up to 230 metres (750 ft).