*** Welcome to piglix ***

GE steam turbine locomotives

GE steam turbine locomotives
Union Pacific's General Electric steam turbine locomotives, circa April 1939
Union Pacific's General Electric steam turbine locomotives, circa April 1939
Type and origin
Power type Steam turbine
Designer General Electric
Builder General Electric
Build date 1938
Total produced 2
Specifications
Configuration:
 • Whyte 4-6-0-0-6-4T
 • AAR 2+C-C+2
Gauge 4 ft 8 12 in (1,435 mm)
Leading dia. 36 in (910 mm)
Driver dia. 44 in (1,100 mm)
Trailing dia. 36 in (910 mm)
Length 90 ft 10 in (27.69 m)
Width 10 ft (3.0 m)
Height 15 ft 34 in (4.591 m)
Loco weight 548,000 lb (249,000 kg)
RPM range 12,500
Head end power Yes
Boiler pressure 1,500 psi (10,000 kPa)–1,600 psi (11,000 kPa)
Performance figures
Maximum speed 125 mph (201 km/h)
Power output 2,500 hp (1,900 kW)
Tractive effort Starting: 86,500 lbf (385,000 N)
Continuous: 32,000 lbf (140,000 N)–40,500 lbf (180,000 N)
Career
Operators Union Pacific
New York Central
Great Northern
Locale United States
Delivered April 1939
Withdrawn June 1939 (UP)
1943 (GN)
Disposition Scrapped
Type and origin
Power type Steam turbine
Designer General Electric
Builder General Electric
Build date 1938
Total produced 2
Specifications
Configuration:
 • Whyte 4-6-0-0-6-4T
 • AAR 2+C-C+2
Gauge 4 ft 8 12 in (1,435 mm)
Leading dia. 36 in (910 mm)
Driver dia. 44 in (1,100 mm)
Trailing dia. 36 in (910 mm)
Length 90 ft 10 in (27.69 m)
Width 10 ft (3.0 m)
Height 15 ft 34 in (4.591 m)
Loco weight 548,000 lb (249,000 kg)
RPM range 12,500
Head end power Yes
Boiler pressure 1,500 psi (10,000 kPa)–1,600 psi (11,000 kPa)
Performance figures
Maximum speed 125 mph (201 km/h)
Power output 2,500 hp (1,900 kW)
Tractive effort Starting: 86,500 lbf (385,000 N)
Continuous: 32,000 lbf (140,000 N)–40,500 lbf (180,000 N)
Career
Operators Union Pacific
New York Central
Great Northern
Locale United States
Delivered April 1939
Withdrawn June 1939 (UP)
1943 (GN)
Disposition Scrapped

The General Electric steam turbine locomotives were two steam turbine locomotives built by General Electric (GE) for Union Pacific (UP) in 1938. The two units were streamlined, 90 feet 10 inches (27.69 m) in length, capable of producing 2,500 horsepower (1,900 kW), and reputedly able to attain speeds of 125 miles per hour (201 km/h). Stylistically, they resembled the power units of UP's Pullman-designed M-10003 through M-10006 trainsets and contemporary Electro-Motive Corporation (EMC) diesel designs.

The two locomotives were delivered to UP in April 1939, and they completed test runs and participated in a variety of publicity events for the railroad, including the grand opening of the Los Angeles Union Passenger Terminal, the world premier of Cecil B. DeMille's film Union Pacific, and even an inspection by President Franklin D. Roosevelt. While the locomotives displayed excellent acceleration and an ability to maintain schedules better than conventional steam locomotives, they also demonstrated serious reliability problems and relatively high maintenance costs; they never entered regular revenue service.

In June 1939, UP returned the locomotives to GE; by December 1941, the railroad had given up on the project. In 1941, the GE steam turbine locomotives were tested by the New York Central, and they were operated by the Great Northern in 1943 during the World War II "power crunch" (a lack of sufficient locomotives to sustain regular operations) before being retired from service later that year. They were scrapped before the end of World War II.


...
Wikipedia

...