GEO Augmented Navigation System
Type Regional satellite-based augmentation system
Developers Indian Space Research Organization
Raytheon
Airports Authority of India
Accuracy 1.5-metre in the horizontal,
2.5-metre in the vertical
Launched 2011-2012
Orbital Radius 26,600 km (approx)
Max operational life 15 years
Fully operational by 2013-14
Project cost 7.74 billion (US$120 million)

The GPS Aided GEO Augmented Navigation (GAGAN) is an implementation of a regional satellite-based augmentation system (SBAS) by the Indian government. It is a system to improve the accuracy of a GNSS receiver by providing reference signals. The AAI’s efforts towards implementation of operational SBAS can be viewed as the first step towards introduction of modern communication, navigation, surveillance/Air Traffic Management system over Indian airspace.

The project has established 15 Indian Reference Stations, 3 Indian Navigation Land Uplink Stations, 3 Indian Mission Control Centers, and installation of all associated software and communication links. It will be able to help pilots to navigate in the Indian airspace by an accuracy of 3 m. This will be helpful for landing aircraft in tough weather and terrain like Mangalore and Leh airports.

The 7.74 billion (US$115 million) project is being created in three phases through 2008 by the Airport Authority of India with the help of the Indian Space Research Organization's (ISRO) technology and space support. The goal is to provide navigation system for all phases of flight over the Indian airspace and in the adjoining area. It is applicable to safety-to-life operations, and meets the performance requirements of international civil aviation regulatory bodies.

The space component will become available after the GAGAN payload on the GSAT-8 communication satellite, which was launched recently, is switched on. This payload was also on the GSAT-4 satellite that was lost when the Geosynchronous Satellite Launch Vehicle (GSLV) failed during launch in April 2010. Final System Acceptance Test was conducted during June 2012 followed by system certification during July 2013.

To begin implementing a satellite-based augmentation system over the Indian airspace, Wide Area Augmentation System (WAAS) codes for L1 frequency and L5 frequency were obtained from the United States Air Force and U.S Department of Defense on November 2001 and March 2005. The system will use eight reference stations located in Delhi, Guwahati, Kolkata, Ahmedabad, Thiruvananthapuram, Bangalore, Jammu and Port Blair, and a master control center at Bangalore. US defense contractor Raytheon has stated they will bid to build the system.


...