Through station | |
Location | Am Bahnhof 3, Fulda, Hesse Germany |
Coordinates | 50°33′14″N 9°41′5″E / 50.55389°N 9.68472°ECoordinates: 50°33′14″N 9°41′5″E / 50.55389°N 9.68472°E |
Line(s) | |
Platforms | 10 |
Other information | |
Station code | 1973 |
DS100 code | FFU |
Category | 2 |
Website | www.bahnhof.de |
History | |
Opened | 1866 |
Fulda station (IATA: ZEE) is an important transport hub of the German railway network in the east Hessian city of Fulda. It is used by about 20,000 travellers each day. It is classified by Deutsche Bahn as a category 2 station. It is a stop for Intercity-Express, Intercity services and regional services. The original station was opened as part of the Frankfurt–Bebra railway in 1866. This was destroyed during the Second World War and rebuilt after the war. The station was adapted in the 1980s for the Hanover–Würzburg high-speed railway.
Fulda is situated on the North-South line (Nord-Süd-Strecke) and the Hanover–Würzburg high-speed line and is an important interchange point between local and long distance traffic. The term 'North-South line' refers to the Bebra-Fulda line north of Fulda, Kinzig Valley Railway and Fulda-Main Railway in the south. The Vogelsberg Railway connects to the hills of the Vogelsberg in the west, and the Fulda–Gersfeld Railway (Rhön Railway) to Gersfeld in the Rhön Mountains in the east.
The planning of the Hanover–Würzburg high-speed line originally envisaged a western bypass of Fulda, with the city connected with the new line through links to the existing line at Maberzell and Kerzell. This route, called Option I, was discarded in the mid-1970s. In the continuation of the regional planning process for the Körle–Bavarian/Hessian border section, which had started in February 1974, two other variants were introduced into the discussion in June, 1976. Under Option II, the new line would also have bypassed Fulda to the west with a link between the new line and the station at Neuhof. Under Option III (which was later substantially realised), it was proposed that the new line would be built along the existing line between Niesig and Bronzell. In 1976, DB adopted Option III and it was approved by the regional planning process in Fulda, which was completed in July 1978.