This article describes the energy and electricity production, consumption and import in Egypt.
The population of Egypt has increased by 14.3% in the five year period from 2004 to 2009 (OECD/World Bank). Every six months there are 1 million more Egyptians. Energy production grew by 36% between 2004 and 2009.
Egypt is classified as having a “high power system size (24,700 MW installed generation capacity in 2010 with more than 40 grid-connected plants).” As of 2010, 99% of the Egyptian population has access to electricity.
When electricity was first introduced in Egypt in 1893, the generation and distribution of electricity was practiced exclusively by private companies. In 1962, the generation, transmission, and distribution of electricity were nationalized under three authorities (the Electricity Production Authority, the Electricity Distribution Authority, and the Electricity Projects Implementation Authority) leaving the government as the sole owner and operator of all electrical companies. These three authorities were replaced in 1965 by the public Egyptian Corporation for Electricity which remained active until 1976 when it was converted into the Egypt Electricity Authority as decreed by electricity sector Law no. 12. In 1978 the Egypt Electricity Authority supervised the establishment of seven geographically divided electricity distribution companies. An additional electrical power distribution authority was established in 1983 as a means of supervising distribution companies which had become independent of the Egypt Electricity Authority.
Between 1996 and 2000 a series of laws and presidential decrees were passed to reorganize and regulate the growing electrical industry.
Between 2000 and 2001, the EEHC implemented a division in the organization of Egypt’s electrical management framework. Generation (production) activity was separated from distribution activity along with the separation of control and transmission between ultra-high-voltage and high-voltage networks. This division rearranged the industry to consist of 13 companies: one company for electricity transmission, one company for hydroelectric power production, four companies for thermal power production, and seven companies for electricity distribution. In 2002 the Delta Company for electricity distribution divided into North Delta and South Delta increasing the number of companies to 14. In 2004 the Cairo company for electricity distribution divided into North Cairo and South Cairo in addition to the Delta company for electricity production dividing into three companies: East Delta, Middle Delta and West Delta.
Currently there are 16 companies affiliated with the EEHC that make up the Egyptian electric utility system: