Diamond Jubilee Footbridge

Diamond Jubilee Footbridge
Coordinates 51°28′21″N 0°10′43″W / 51.4724°N 0.1786°W / 51.4724; -0.1786Coordinates: 51°28′21″N 0°10′43″W / 51.4724°N 0.1786°W / 51.4724; -0.1786
Carries
  • Pedestrians
  • cyclists
Crosses River Thames
Locale
Other name(s) Cremorne Footbridge
Owner Palace Investments Ltd
Preceded by Wandsworth Bridge
Followed by Battersea Railway Bridge
Characteristics
Material Painted steel
Total length 240 metres (790 ft)
Width 9 metres (30 ft)
No. of spans 3
Piers in water 2
History
Designer One-world design architects
Engineering design by
Construction start June 2016

The Diamond Jubilee Footbridge is a proposed pedestrian and cycle bridge over the River Thames in London, England. It is also known as the Cremorne Footbridge and was designed by one-world design architects in conjunction with structural engineers Expedition Engineering and maritime engineers Beckett Rankine. The bridge name commemorates the Diamond Jubilee Celebrations for Queen Elizabeth II, marking the location where she boarded her launch for the start of the Diamond Jubilee river pageant.

Through Community Infrastructure Levy contributions on nearby housing developments Wandsworth Council have around 40% of the funding in place. Piled foundations have been constructed on the Battersea side of the river through a Section 106 Agreement with developer Barratt whilst funding for construction of the rest of the structure is being sought.

The style of the bridge is a combination of bright and biomimetic adopting the tensile strength and overall flexibility of a repeating cross-matrix of thin tapering sections. The bridge design has three spans comprising a small central arch flanked by two larger outer arches, supported by four piers. The maximum height of the bridge is 18.41m AOD, rising approximately 4.5m above the neighbouring railway bridge. The primary structure material is painted structural steel and the deck is shared between pedestrians and cyclists.

The three‐span arrangement of the bridge, with larger outer spans and a smaller central span, maintains unobstructed access to the pier at Albion Quay on the south of the river. It also minimises the need for foundations in the river while limiting the structural height so that the bridge does not extend into the airspace required by the nearby Battersea Heliport. The use of diamond‐shaped steel sections both reflects the name of the bridge and allows the arch section size to be varied to provide efficiency, providing material only where it is needed. With the depth of the sections significantly reduced at towards the top of the arches, the long‐views of the bridge will appear particularly elegant.

The Bridge is supported both by local authority and GLA planning policy. Planning consent has been granted in Wandsworth, Hammersmith & Fulham and by the GLA and TfL. Wandsworth’s Riverside SPD enables the council in future to assign CIL contributions to a bridge and a recent S106 agreement with Barratt London has secured the piling of the bridges foundations on the Battersea side of the river which is now complete.


...