Daxing Line, Beijing Subway | |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Daxing | |||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | ||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||
Termini |
Gongyixiqiao Tiangongyuan |
||||||||||||||||||||||||||||||||||||||
Stations | 11 | ||||||||||||||||||||||||||||||||||||||
Daily ridership | 310,000 (2014 Avg. Daxing Line only) 376,000 (2014 Peak Daxing Line only) |
||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||
Opened | 30 December 2010 | ||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing MTR Corporation Limited | ||||||||||||||||||||||||||||||||||||||
Depot(s) | Nanzhaolu | ||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||
Line length | 21.7 km (13.5 mi) | ||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||
Operating speed | 100 km/h (maximum service speed) | ||||||||||||||||||||||||||||||||||||||
|
The Daxing Line of the Beijing Subway (Chinese: 北京地铁大兴线; pinyin: běijīng dìtiě dàxīng xiàn) is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Majialou, on the 4th Ring Road in Fengtai District, to Nanzhao Lu, beyond the 6th Ring Road in Daxing District. The Daxing Line is about 21.7 km in length with 18 km underground. Of the 12 stations, only Xihongmen is above the surface. Full-scale construction began in 2007 and the line was opened on December 30, 2010, 14:00 local time.
Though the Daxing Line is classified as a distinct line, the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers. With the opening of the Daxing Line on December 30, 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:
Daxing Line and Line 4 stations, from north to south (with transfer points):
a. ^ Line 4 ridership included.
b. ^ See "北京京港地铁有限公司". Mtr.bj.cn. 2010-12-29. Archived from the original on 2011-01-01. (Chinese) & "Beijing MTR Corporation Limited". Mtr.bj.cn. 2010-09-27. Archived from the original on 2011-10-09. (English)