*** Welcome to piglix ***

Danube Bridge 2

New Europe Bridge
Calafat Vidin 02797 pont.jpg
Coordinates 44°00′08″N 22°56′54″E / 44.0021554°N 22.9482770°E / 44.0021554; 22.9482770
Carries Four lanes of roadway, one railway track and a combined bicycle path/pedestrian walkway (the designed second walkway was not completed: it runs only from the Bulgarian river bank to the island under the bridge)
Crosses Danube
Locale Between Calafat, Romania and Vidin, Bulgaria, at river kilometer 796
Official name New Europe Bridge
Website vidincalafatbridge.bg
Characteristics
Design Cable-stayed bridge
Total length 1,971 m (6,467 ft)
Width 31.35 m (102.9 ft)
Longest span 180 m (590 ft)
History
Designer Fernández Casado
Constructed by FCC Construccion
Opened 14 June 2013
Statistics
Daily traffic 1,360 vehicles/day
Toll 0–37 euro
External images
Panoramic view of the bridge under construction (14 October 2012)
(A location map of the images is placed down below on the same page)

The New Europe Bridge, previously known as the Danube Bridge 2 (Bulgarian: Дунав мост 2, Dunav most 2), and informally called the Calafat-Vidin Bridge (Bulgarian: Мост Видин–Калафат, Most Vidin–Kalafat; Romanian: Podul Calafat–Vidin), is a road and rail bridge between the cities of Vidin, Bulgaria and Calafat, Romania. It is the second bridge on the shared section of the Danube between the two countries. It is a cable-stayed bridge and was built by the Spanish company Fomento de Construcciones y Contratas, at the cost of 226 million. It was officially opened with a ceremony held on 14 June 2013. The first vehicles were allowed to cross the bridge after midnight, on 15 June 2013.

As early as in 1909 the local authorities in Vidin (in Bulgaria) had first expressed their interest in building a bridge to Calafat (in Romania), by sending a petition to the Bulgarian parliament and to Aleksandar Malinov, who was prime minister at that time. These historical documents were shown on Bulgarian television in June 2013, during a report on the Second Danube Bridge. Bulgarian newspapers hence described the opening of the New Europe Bridge across the Danube river as 'the materialising of a century old dream'.

Building a bridge between Calafat (in Romania) and Vidin (in Bulgaria) had been discussed more seriously since the late 1970s, but the plan was abandoned over and over again. For centuries there had been no bridges crossing the Danube river between Bulgaria and Romania since the destruction of Constantine's Bridge, which was built by the Romans, until the Giurgiu–Ruse Friendship Bridge was built and opened in 1954. During the late 1990s, Bulgaria had to close its border with Yugoslavia, because of the war in Kosovo, followed by an international economic boycott against Yugoslavia. This caused great damage to the already weak economy in northwestern Bulgaria. In fact, the whole country became isolated, since Bulgarians had always been relying on the road through Serbia for their transit transport to Western Europe.


...
Wikipedia

...