Through station | |||||||||||||||||||||
Location |
Bilk, Düsseldorf, North Rhine-Westphalia Germany |
||||||||||||||||||||
Coordinates | 51°12′28″N 6°46′37″E / 51.207713°N 6.776874°ECoordinates: 51°12′28″N 6°46′37″E / 51.207713°N 6.776874°E | ||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms | 2 | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | 1405 | ||||||||||||||||||||
DS100 code | KDBH | ||||||||||||||||||||
IBNR | 8001585 | ||||||||||||||||||||
Category | 4 | ||||||||||||||||||||
Website | www.bahnhof.de | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 1891 | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Düsseldorf-Bilk station is a through station in the district of Bilk in the city of Düsseldorf in the German state of North Rhine-Westphalia. It has two platform tracks and it is classified by Deutsche Bahn as a category 4 station.
The station is on the new line opened by the Prussian state railways on 1 October 1891 between the Hamm Railway Bridge and Gerresheim as part of the construction of Düsseldorf Hauptbahnhof. The station building built in 1891 was demolished in 1986, as part of the rebuilding of the line for the establishment of Rhine-Ruhr S-Bahn lines S 8.
The station is served by S-Bahn lines S 8 between Mönchengladbach and Wuppertal-Oberbarmen or Hagen, S 11 between Düsseldorf Airport and Bergisch Gladbach and S 28 between Mettmann Stadtwald and Kaarster See, each every 20 minutes.
It is served by two bus routes operated by Rheinbahn at 20 minute intervals: 835 and 836.
The Düsseldorf Stadtbahn has a tunnel from Düsseldorf-Bilk station to Düsseldorf-Wehrhahn station, known as the Wehrhahn line (German: Wehrhahn-Linie). This 3.5 km tunnel was completed in 2016. Just as every other underground line opened previously in Düsseldorf, the Wehrhahn line is a replacement for current surface tram lines. The trams on this line are entering the new tunnel over a ramp at Bilk station and run from there underneath the city centre towards the north-east, where they are emerging shortly before Wehrhahn railway station. Five new underground stations and the station Heinrich-Heine-Allee are part of the line, which serve an estimated daily passenger volume of approximately 53,000. These new stations are Pempelforter Straße, Schadowstraße, the existing station Heinrich-Heine-Allee, Benrather Straße, Graf-Adolf-Platz and Kirchplatz (Düsseldorf) in the direction from Wehrhahn station to Bilk station. The new lines are the U71, U72, U73 and the U83.